Update a cluster
Update one replica at a time while preserving a healthy metadata majority. Pin the intended release artifacts, keep stable keys and recovery identity, and wait for each replacement to become ready. Clients may need to reconnect. Stop the rollout if access, data verification or recovery publication fails.
Upgrades and failures
Section titled “Upgrades and failures”Upgrade one replica at a time and wait for readiness before continuing:
helm upgrade boilstream oci://ghcr.io/boilingdata/charts/boilstream \ --version '<chart-version>' \ --namespace boilstream \ --values my-values.yaml \ --set-string image.digest='sha256:<release-image-digest>' \ --set-string configRenderer.image.digest='sha256:<python-image-digest>'kubectl -n boilstream rollout status statefulset/boilstreamThe default disruption budget keeps two of three replicas available during voluntary maintenance. Spread replicas across nodes or failure domains when the platform permits.
A client connected to a failed pod must reconnect; existing TCP sessions are not promised to migrate. With quorum, metadata operations continue through healthy replicas. Without quorum, metadata-dependent admission fails closed. A replacement pod catches up from peers without a PVC.
For complete local-state loss, fence the old incarnation, increment the recovery epoch once, set a new recovery ID on every replica, and restore with the original cluster ID, S3 prefix, and encryption key. The recovery point is the latest completed generation.
Failure and rollback
Section titled “Failure and rollback”Stop the rollout if quorum or verification fails. Keep the stable encryption/signing keys and cluster identity. Restore the previous deployment values and image only when the release supports that downgrade; otherwise follow its recovery procedure. Do not assume a Helm rollback reverses stored data or format changes.
Verify
Section titled “Verify”kubectl -n boilstream rollout status statefulset/boilstreamkubectl -n boilstream get pods,gateway,certificateboilstream-admin cluster statusBefore admitting production traffic, exercise authentication, catalog vending, every enabled ingestion/query interface, a leader failover, a rolling restart, and an S3-only restore in a staging cluster built from the same release artifacts.